4-28
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
September 2005
Chapter 4 Perform Node Acceptance Tests
NTP-G46 Perform the Line Amplifier Node with OSC-CSM Cards Acceptance Test
Step 8
If you are using a tunable laser, follow the manufacturer’s instructions to complete the following steps.
If you are using a TXP_MR_2.5G card, continue with
.
a.
Set the output power to a nominal value, such as –3 dBm.
b.
Set the tuner to the wavelength under test, then continue with
Step 9
If you are using a TXP_MR_2.5G card, complete the
“DLP-G268 Provision TXP_MR_2.5G Cards for
Acceptance Testing” task on page 4-4
for the TXP containing the wavelength you will test. Refer to
, if needed.
Step 10
Connect the tunable laser transmitter or the TXP_MR_2.5G card DWDM TX port to the east OSC-CSM
LINE RX port using a 10-dB bulk attenuator.
Caution
Failure to use proper attenuation might damage equipment.
Step 11
If an OPT-PRE card is installed on the east side, complete the
“DLP-G80 Verify the OPT-PRE Amplifier
Laser and Power” task on page 4-41
. If not, continue with
.
Step 12
Display the west OSC-CSM card in card view.
Step 13
Click the
Provisioning > Optical Line > Parameters
tabs. Locate the Port 3 Power value. Verify that
the value is higher than –30 dBm. If the power value is not higher than –30 dBm, check your connections
and clean the fibers using the
“NTP-G115 Clean Fiber Connectors” procedure on page 13-25
. If this does
not change the power value, consult your next level of support.
Step 14
If an OPT-PRE is installed on the west side of the shelf, complete the
Amplifier Laser and Power” task on page 4-41
. If not, continue with
Step 15
Display the east OSC-CSM card in card view.
Step 16
Click the
Provisioning > Optical Line > Parameters
tabs. Locate the Port 2 Power value. Verify that
the value is higher than –30 dBm. If the power value is not higher than –30 dBm, check your connections
and clean the fibers using the
“NTP-G115 Clean Fiber Connectors” procedure on page 13-25
. If this does
not change the power value, consult your next level of support.
Step 17
Disconnect the TXP or tunable laser from the east OSC-CSM card.
Step 18
Remove the physical loopback created on the west OSC-CSM card in
.
Step 19
Create a loopback on the east OSC-CSM by connecting the LINE TX port with LINE RX port using a
patchcord and 10-dB bulk attenuator.
Caution
Failure to use proper attenuation might damage equipment.
Step 20
Wait 90 seconds, then in node view click the
Alarms
tab. Verify that the LOS alarm on the east
OSC-CSM card has cleared. The clearing of the LOS alarm indicates that the OSC link is active on the
east side.
Note
An SDCC Termination Failure alarm will continue to appear due to the OSC signal loopback,
and an LOS alarm will appear for the west OSC-CSM, Port 1 (OSC).
If the alarm clears, continue with
. If not, perform the following steps:
a.
Remove the 10-dB bulk attenuator on the OSC-CSM LINE TX and LINE RX ports and reconnect
using only the patchcord.
Summary of Contents for ONS 15454 DWDM
Page 38: ...Figures xxxviii Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 54: ...Procedures liv Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 64: ... 64 Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 Chapter ...