Step 1
Display your site plan in Cisco MetroPlanner.
Step 2
Verify that the topology where you plan to run the ETR_CLO or ISC service is one of the topologies that
supports these services:
•
Single span—Two terminal sites with no intermediate sites in between and the following cards
installed:
–
32MUX-O and 32DMX-O cards
–
32WSS and 32DMX cards
–
32WSS and 32-DMX-O cards
shows a single-span topology as displayed in Cisco MetroPlanner.
Figure 5-1
Single-Span Topology
•
Point-to-Point—Two terminal sites with the following cards installed:
–
32MUX-O and 32DMX-O cards
–
32WSS and 32DMX cards
–
32WSS and 32-DMX-O cards
Line amplifiers can be installed between the terminal sites, but intermediate (traffic terminating)
sites cannot be installed.
shows a point-to-point topology as shown in
Cisco MetroPlanner.
Figure 5-2
Point-to-Point Topology
Purpose
This task verifies that the DWDM network topology can support the IBM
ETR_CLO and ISC services. These services cannot be provisioned on all
DWDM topologies.
Tools/Equipment
Cisco MetroPlanner site plan.
Prerequisite Procedures
None
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Provisioning or higher
134361
Site 1
Site 4
W
E
134360
Site 1
Site 4
Site 2
E
W
E
W
Site 3
E
W
Summary of Contents for ONS 15454 DWDM
Page 38: ...Figures xxxviii Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 54: ...Procedures liv Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 64: ... 64 Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 Chapter ...