10-5
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
September 2005
Chapter 10 Manage the Node
DLP-G159 Refresh Automatic Power Control Information
Step 4
Return to your originating procedure (NTP).
DLP-G159 Refresh Automatic Power Control Information
Step 1
In node view, click the
Maintenance > DWDM > APC
tabs.
Step 2
Click
Refresh
.
Step 3
Return to your originating procedure (NTP).
NTP-G78 View ROADM Node Power Equalization
Step 1
Complete the
“DLP-G46 Log into CTC” task on page 2-25
. If you are already logged in, continue with
Step 2.
Step 2
In node view, click the
Maintenance > DWDM > ROADM Power Monitoring
tabs.
Step 3
On the Power Monitoring tab, view the following east-to-west (E > W) and west-to-east (W > E) power
information:
•
Padd—Add power. This power level is represented by the red bar.
•
Ppt—Pass-through power. This power level is represented by the yellow bar.
•
Pout—Output power. This power level is represented by the blue bar. It shows the per-channel
(wavelength) power at the 32WSS output (COM_TX) port.
Purpose
This task refreshes the DWDM APC information.
Tools/Equipment
A node provisioning plan prepared by Cisco MetroPlanner is required.
Prerequisite Procedures
All procedures in the following chapters:
DLP-G46 Log into CTC, page 2-25
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Superuser
Purpose
This procedure allows you to view ROADM node power equalization
levels.
Tools/Equipment
None
Prerequisite Procedures
DLP-G46 Log into CTC, page 2-25
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Superuser
Summary of Contents for ONS 15454 DWDM
Page 38: ...Figures xxxviii Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 54: ...Procedures liv Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Page 64: ... 64 Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 Chapter ...