Figure 147: Engaging the Deep-Front Panel and Shelf
Step 5
Slide the deep-front panel screws inwards using the plastic tabs to engage the retention features and the pins
with the shelf notches and hinges (see the following figure). Verify the engagement by gently applying outward
pressure to the panel.
Figure 148: Engaging the Deep-Front Panel and Shelf
Step 6
Lock the deep-front panel by tightening the screws to a torque value of 6.5 in-lb (0.75 N-m).
Step 7
Connect the other end of the ground strap cable to the ground point present on the deep-front panel exterior.
Cisco ONS 15454 Hardware Installation Guide
225
Installing the ONS 15454 M2 Shelf
NTP-G343 Install the Deep-Front Panel of the ONS 15454 M2 Shelf
Summary of Contents for ONS 15454
Page 2: ... 2019 Cisco Systems Inc All rights reserved ...
Page 16: ...Cisco ONS 15454 Hardware Installation Guide xvi Contents ...
Page 28: ...Cisco ONS 15454 Hardware Installation Guide xxviii Preface Preface ...
Page 36: ...Cisco ONS 15454 Hardware Installation Guide 6 Overview Cisco ONS 15454 M6 Shelf ...
Page 510: ...Cisco ONS 15454 Hardware Installation Guide 480 Hardware Specifications Dimensions ...