• #2 Phillips Dynamometric screwdriver
• Medium slot-head screwdriver
• Small slot-head screwdriver
• Screws: #12-24 x 0.50 pan-head Phillips screws (8)
• Wing head screws (8)
• One air plenum kit (horizontal and vertical air plenum)
Tools/Equipment
As needed
Required/As Needed
Onsite
Onsite/Remote
None
Security Level
In the ANSI 19-inch rack or cabinet, the air plenum can be mounted only if the minimum opening is 20.600
inches to install the vertical air plenums behind the front rails.
Note
Procedure
Step 1
Place the horizontal air plenum at the bottom of the shelf slot in the ANSI 19-inch cabinet.
Step 2
Insert the wing head screws provided with the kit, and tighten to a torque value of 11.5 in-lb (1.3 N-m) as
shown in the following figure.
Figure 179: Installing the bottom horizontal air plenum in the ANSI 19-inch cabinet
Step 3
Install the vertical air plenum to the left of the horizontal air plenum:
a) Insert the vertical plenum in the free space between the horizontal plenum and cabinet.
b) Install the wing head screws fom the internal side of the horizontal plenum as shown in the following
figure.
c) Tighten the screws to a torque value of 11.5 in-lb (1.3 N-m).
Cisco ONS 15454 Hardware Installation Guide
281
Installing the ONS 15454 M6 Shelf
DLP-G766 Install Air Plenum for ONS 15454 M6 Shelf in ANSI 19-inch Cabinet
Summary of Contents for ONS 15454
Page 2: ... 2019 Cisco Systems Inc All rights reserved ...
Page 16: ...Cisco ONS 15454 Hardware Installation Guide xvi Contents ...
Page 28: ...Cisco ONS 15454 Hardware Installation Guide xxviii Preface Preface ...
Page 36: ...Cisco ONS 15454 Hardware Installation Guide 6 Overview Cisco ONS 15454 M6 Shelf ...
Page 510: ...Cisco ONS 15454 Hardware Installation Guide 480 Hardware Specifications Dimensions ...