A P P E N D I X
B
Integrating UCS Components in the Dynamic
Rack
This chapter contains the following sections:
•
•
•
Equipment Placement Guidelines, on page 62
•
Weight Considerations, on page 62
•
Chassis Installation and Cabling, on page 63
•
•
•
Installing Fabric Interconnects, on page 71
•
Installing a UCS Rack Server, on page 72
•
Running Diagnostics, on page 72
•
•
System Testing and Verification, on page 73
•
Configure the Blade Chassis, on page 77
•
Blade Connectivity Verification, on page 78
•
•
Configure the Rack Server, on page 80
•
Reset Fabric Interconnects, on page 80
•
•
C-Series Rack Integration, on page 81
•
All C-Series Rack Servers (Except 3160 and 3260), on page 81
•
C-Series 3160 and 3260 Rack Servers, on page 82
•
•
Shipping Guidelines, on page 83
•
Cisco Certified Products for Rack Integration and Approved Third-Party Racks, on page 86
•
Cisco Certified UCS Products for Rack Integration, on page 86
•
Third-Party Approved Racks, on page 86
Cisco R42612 Rack and RP-Series Metered Input PDU Installation Guide
61