48
Release Notes for Cisco RF Gateway 10 in Cisco IOS Release 12.2SQ
OL-18677-10
Caveats
Open Caveats for Cisco IOS Release 12.2(44)SQ2
Caveat
Description
CSCsu27160
Symptoms: GUI: HTTP CORE process may take a large percent of Supervisor CPU
at web page refresh.
Conditions: This issue occurs when a GUI web browser page is refreshed.
Workaround: There is no workaround.
CSCsv01988
Symptoms: The GUI “Summary” page does not display dual Supervisor interfaces
correctly. The GUI does not display information on the “Summary” page in the
SUP Input B/W or SUP Input Measurement sections.
Conditions: This issue occurs when redundant Supervisor cards are configured.
Workaround: There is no workaround.
Command RF
Output Power
DRFI requires support for an 8-dB range of commanded transmit power per
channel below the maximum power supported for the channel (maximum power is
8 dB). The Cisco RFGW-10 is tested to a range of 10 dB of commanded power
below the maximum supported channel power.
Note
The Cisco RFGW-10 CLI allows a commanded RF power range 30 dB
lower than maximum supported channel power (maximum power - 30 dB).
However, a commanded power range below 10 dB of maximum power
supported is not calibrated and may not be accurate.
RF Gateway 10
Cablelabs DRFI
Compliance
The noise floor and spurious emissions of the Cisco RF Gateway 10 DS-48 line
card do not meet the requirements of the Cablelabs DRFI technical specification.
12.2(44)SQ to
12.2(44)SQ2
upgrade
The image upgrade of the Supervisor card involving Timing, Communication and
Control (TCC) card may take up to 40 minutes from Cisco IOS Release 12.2(44)SQ
to 12.2(44)SQ2. During the upgrade of the TCC card, the DS-48 line cards are
reset. The cable modems go offline till the upgrade process is complete, and line
cards are ready (LED is Green). Also note that during the upgrade process, many
error and alarm messages are sent to the log that are expected and will eventually
clear once the upgrade is complete.
12.2(44)SQ1 to
12.2(44)SQ2
upgrade
The image upgrade involving the TCC card may take up to 10 minutes from
12.2(44)SQ1 to 12.2(44)SQ2. During the TCC upgrade, the DS-48 line cards are
reset and some error and alarm messages are sent to the log that are expected and
will eventually clear once the upgrade is complete.