C H A P T E R 2
Installation Notes and Warnings for the Cisco UCS 5108 Server Chassis
Unpacking and Inspecting the Chassis
Attaching the Round Hole Adapter Kit to the Rails (Optional)
Installing the Round Hole Adapter Kit
Inserting the Chassis into the Rack
DC Power Installation Procedure
Cabling Considerations for Fabric Port Channels
Proper FEX and Fabric Interconnect Port Connectivity
Removing the Chassis from a Rack
SFP+ Twinax Copper Transceivers
SFP and SFP+ Transceivers for the UCS 6324 Fabric Interconnect
Twinax Copper Cables for the UCS 6324 Fabric Interconnect
QSFP+ Copper Optical Transceivers for the UCS 6324 Fabric Interconnect
Replacing a Copper Twinax SFP+ Transceiver with an Optical SFP+ Transceiver
C H A P T E R 3
Installing and Removing Components
Installing and Removing a Blade Server
Cisco UCS 5108 Server Chassis Installation Guide
vi
Contents