• The system can support up to two VIC cards total in UCSM mode. Only the VIC card installed in slot 1
can be used for both UCS Manager management and data traffic. A second VIC installed in slots 2 - 8
is used for data traffic only.
• The VICs are supported in slots 1 - 8. Of these 8 slots, CPU module 1 (CPU 1 and 2) supports slots 1,
2, 5, 8; CPU module 2 (CPU 3 and 4) supports slots 3, 4, 6, 7.
Replacing Components Inside a CPU Module
When handling server components, handle them only by carrier edges and use an electrostatic discharge (ESD)
wrist-strap or other grounding device to avoid damage.
Caution
This section describes how to install and replace CPUs and DIMMs inside a CPU module.
Never remove a CPU module without shutting down and removing power from the server.
Caution
See also:
•
Replacing Components Inside the Main Chassis, on page 17
•
Replacing Components Inside an I/O Module, on page 90
Replacing CPUs and Heatsinks
This section contains information for replacing CPUs and heatsinks inside a CPU module.
Special Information For
Upgrades to Second Generation Intel Xeon Scalable Processors
You must upgrade your server firmware to the required minimum level before you upgrade to the Second
Generation Intel Xeon Scalable processors that are supported in this server. Older firmware versions cannot
recognize the new CPUs and this would result in a non-bootable server.
Caution
The minimum software and firmware versions required for this server to support Second Generation Intel
Xeon Scalable processors are as follows:
Table 5: Minimum Requirements For Second Generation Intel Xeon Scalable processors
Minimum Version
Software or Firmware
4.0(4)
Server Cisco IMC
4.0(4)
Server BIOS
4.0(4)
Cisco UCS Manager (UCS-integrated servers only)
Maintaining the Server
67
Maintaining the Server
Replacing Components Inside a CPU Module