Step 4
Reinstall the IFMs and expansion modules.
a) Go to
Installing an Intelligent Fabric Module, on page 90
b) Go to
Installing an UCS X-Fabric Module Blank, on page 92
Step 5
Reconnect all power cables.
The chassis automatically powers on when it receives inlet power.
Removing the Power Entry Modules
PEMs support inlet power to the chassis from the facility. It is a best practice to remove all power from the
system when replacing a PEM.
Follow all electrical safety precautions when working with facility power. Failure to do so can result in damage
to equipment or pose a risk of injury or death to personnel.
Danger
The following task shows removing both PEMs. If you are removing only one PEM, you will need to loosen
only the PEM screw for the replaced PEM, not both screws as shown in the illustrations.
Note
Before you begin
The power entry modules (PEMs) are connected to facility power, so you must disconnect facility power from
the PEM that you will be removing.
Cisco UCS X9508 Server Chassis Installation Guide
81
Installing and Removing Components
Removing the Power Entry Modules
Summary of Contents for UCS X9508
Page 6: ...Cisco UCS X9508 Server Chassis Installation Guide vi Contents ...
Page 26: ...Cisco UCS X9508 Server Chassis Installation Guide 18 Overview Interpreting LEDs ...
Page 31: ...Cisco UCS X9508 Server Chassis Installation Guide 23 Installation Handling the Chassis ...
Page 64: ...Cisco UCS X9508 Server Chassis Installation Guide 56 Installation Repacking the Chassis ...
Page 124: ...Cisco UCS X9508 Server Chassis Installation Guide 116 Technical Specifications Switzerland ...