Revised: September 2, 2014,
Cisco USC 5030 Installation Guide
About Your USC 5030
The Cisco USC 5030 chassis is uniquely designed to hold either one or two Cisco USC enterprise licensed small cell modules.
Currently installation of one small cell module is supported. For a 3G enterprise solution, it is populated with the Cisco USC 5310
(Band 1 or Band 2/5).
Before You Begin
Power Considerations
Power options for the USC 5030 include:
•
IEEE 802.3at POE+ 25.5 W delivered from the upstream Ethernet switch
•
Cisco 3600 Series Power Injector (AIR-PWRINJ4=)
•
Cisco 3600 Series local power supply (AIR-PWR-B=)
Installation Considerations
Install your USC 5030:
•
in a central location, in an area where people are most likely to make calls
•
away from windows, to avoid the signal leaking outside or external signals leaking in
•
in an open area with airflow; not in a closed cabinet which reduces the signal strength
If you have thick internal walls, or metal, fire or rotating doors, plan to place units at either side of the obstruction at a distance shorter
than 49 feet (15 m). Install a unit across from a corner to provide coverage on both sides of the corner.
Connect Your Cisco USC 5030
Currently your Cisco USC 5030 can support the installation of up to one small cell module only (for
example, the Cisco USC 5310).
Note
Power must be disconnected before installing or removing a small cell module from the USC 5030 chassis.
Note
2