3-4
Cisco VG202 and Cisco VG204 Voice Gateways Hardware Installation Guide
OL-15959-01
Chapter 3 Installing Cisco VG202 and Cisco VG204 Voice Gateways
Mounting Tools and Equipment
Mounting Tools and Equipment
Obtain the following tools and parts to install Cisco VG202 and Cisco VG204 voice gateways:
•
Screws and anchors for wall-mounting
–
Eight wood screws or other fasteners, for installing the chassis on a wall. An additional starter
screw can be used to facilitate wall-mounting.
•
ESD-preventive wrist strap
In addition, you might need the following external equipment:
•
Console terminal or personal computer with terminal emulation software
•
PC running terminal emulation software for administrative access
•
Modem for remote access
•
Analog voice RJ-11 cable
Unpacking and Inspection
Do not unpack the Cisco VG202 or Cisco VG204 voice gateway until you are ready to install the
equipment. If the installation site is not ready, keep the chassis in its shipping container to prevent
accidental damage.
The Cisco VG202 or Cisco VG204 voice gateway, cables, and any optional equipment that you ordered
might be shipped in more than one container. When you unpack each shipping container, check the
packing list to ensure that you received all the following items:
•
Cisco VG202 or Cisco VG204 voice gateway
Installation site prepower check completed
Required tools available
Additional equipment available
Cisco VG received
Quick start guide received
Regulatory compliance and safety information received
Information packet, warranty card, and Cisco.com card received
Software version verified
Rack, desktop, or wall-mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Modem attached to console port (for remote configuration)
Signal distance limits verified
Startup sequence steps completed
Initial operation verified
Task
Verified by
Date
Summary of Contents for VG202
Page 4: ......