III.ASSEMBLY
8
STEP 2
STEP 1
STEP 1
1. Carry out the machine from the package by two persons and place it
lightly on �lat �loor, and put other �ittings beside the machine.
2. Put the handrail on running deck frame and lock it with screw and
�lat at both sides.
1. use 2 knobs to �ix the handrail to the main frame from the left and
right sides and Adjust the Ipad holder in appropriate angle.
2.Plug in the power and turn on the switch. Press the start key and
stop key on the remote control to check if the machine canwork well.
STEP 4
When the handrail tube is not needed, loosen the 2 knobs on
the handrail support tube, rotate the handrail in the direction
of A, and use 2 knobs to �ix the handrail to the main frame
from the left and right sides and hiding the Ipad holder under
the running belt. You can run normally in this state.
NOTICE:ASSEMBLY REQUIRES TWO PERSONS
No.
Fittings
Qty
1
remote controller
1
2
Flat
Konb
Screw
Silicone oil
5mm wrench
6
7
8
6mm wrench
Multi- wrench
2
3
2
4
2
5
1
1
1
1
STEP 3
When not use the treadmill, you can fold the machine in
direction of arrow A until the transportation wheels pop
up in direction of arrow B to save space .
Https://www.LikeSporting.com