13
DO NOT DIVE.
INSTALLATION INSTRUCTIONS
1.) Put spa in final position that allows for access to equipment
and spa components.
2.) Remove front side panel (This is the side where the main topside
control panel is located) so electrical can be hooked up to the
spa system pack. Panels are removed by unscrewing the screws in
the corner sections and side panels. (using #2 square bit). Using a
Phillips screwdriver may result in stripping of the screw.
3.) Fill spa at least 1” above filter. We recommend filling the spa through the filter area.
4.) Turn the power on to the spa. Spa will go through its priming mode. This lasts approximately 5
minutes.
5.) It may be necessary to bleed air from the pump(s) on your spa if, after start up, your spa pumps
do not operate.
Due to the nature of water flow and hydro-therapy pumps, please be advised that air locking
of pumps may occur. We have taken measures to reduce the possibility of this, but it still may
occur, especially after refilling a spa. This is not a service covered under warranty.
To relieve an airlock situation, loosen the union (see picture) on the discharge of the pump (see
arrow on picture of pump below). Water should leak out. Tighten the union and test the pump
for proper jet flow. If needed repeat process.
6.) Adjust water chemistry according to the instructions provided in the “Water quality
Maintenance Section” (page 17).
7.) Your spa water will heat approximately 4° - 7° per hour, for all 240V spas. This varies depend-
ing on the size of the spa. Step into the soothing waters of your new spa!
RELAX AND ENjOY.
Pump Union
Airlock