background image

 

HYGIENIC SIGHT FLOW INDICATORS

 

Installation, Operation, and Maintenance Manual

 

 

 

 

16633 Foltz Parkway, Strongsville, OH 44149, USA 

 +1  440-572-1500    •   clark-reliance.com 

Section: 

T500 

Bulletin: 

T500.3 

Date: 

03/16/15 

Supersedes:  NEW

 

Summary of Contents for Hy-Sight

Page 1: ...C SIGHT FLOW INDICATORS Installation Operation and Maintenance Manual 16633 Foltz Parkway Strongsville OH 44149 USA 1 440 572 1500 clark reliance com Section T500 Bulletin T500 3 Date 03 16 15 Superse...

Page 2: ...n 2 1 2 Components 3 2 Installation 4 2 1 Unpacking 4 2 2 Visual Inspection 4 2 3 Positioning 4 2 4 Commissioning Start Up 4 3 Maintenance 5 3 1 Disassembly 5 3 2 Assembly 5 16633 Foltz Parkway Strong...

Page 3: ...Operating Temperature F C PSIG Bar g EPDM Silicone FKM Viton FEP Silicone 1 4 300 21 265 129 450 232 400 204 450 232 3 8 300 21 265 129 450 232 400 204 450 232 1 2 300 21 265 129 450 232 400 204 450...

Page 4: ...antity 2 Material 316L Stainless Steel standard options available Glass Cylinder Quantity 1 Material 3 1 Borosilicate Glass standard Acrylic available Sealing O Ring Quantity 2 Material USP Class VI E...

Page 5: ...the life time of the unit it is essential that the unit is not exposed to any of the following a Piping loads or torsional forces the unit is not designed to be load bearing b Sudden increases of pre...

Page 6: ...familiar with this IOM manual The following steps should be taken a Release the tri clamps from both ends of the Hy Sight unit remove the unit as a whole b Unscrew the head connections from the body o...

Page 7: ...mponents together a small gap between body head connection should be visible h Fit the final centralizing O ring into the groove in outstanding head connection i Now add lubricant to the visible surfa...

Reviews: