16633 Foltz Parkway
●
Strongsville, OH 44149 USA
●
Telephone: +1 (440) 572-1500
●
Fax: +1 (440) 238-8828
www.clark-reliance.com
●
sales@clark-reliance.com
Figure 14: Power Supply in Enclosure
REPLACEMENT OF POWER SUPPLY AND HOUSING ASSEMBLY FOR MODEL EPL-100
NOTE: Make sure AC power is off before removing cover.
1)
Loosen cover locking screw and open the cover of the power supply housing. Disconnect AC power and
remove AC wires from enclosure.
2)
Remove assembly from gage and relocate to desired work area.
3)
Disconnect power cable between power supply and light bar assembly.
4)
Trim gasket material at top end cap to match slot opening and slide out top bracket and mounting hardware.
5)
Loosen power supply screws and slide power supply off light bar assembly.
6)
Slide new power supply onto light bar assembly.
7)
Insert bracket and mounting hardware for top bracket back into slot.
8)
Securely tighten the power supply screws and the top bracket screw.
9)
Install power cord between power supply and light strip making sure connectors are fully connected.
10)
Bench test unit by applying AC through AC Input Connector (ref. Figure 14).
11)
Re-install on gage and reconnect AC power.
Power Supply in Enclosure