3-14
Urea(SCR) System (C60-80D, Doosan Engine)
IMPORTANT
Do not add urea solution if the tank is full(recommended
amount is 20 L). Overfilling the tank may cause frosting in
winter and the urea solution will expand and damage the
tank as well as the SCR system.
Make sure that there is NO foreign substance while filling
the urea solution tank, including any additive and water.
Such foreign substance will gravely affect the forklift per-
formance and may cause a malfunction.
Make sure that the urea solution meets the specifications
of ISO 22241. Urea solution of poor quality will gravely
affect the forklift performance and may cause a malfunc-
tion.
• Turn the cap of the tank clockwise and close it completely. Wipe
the area around the cap with a clean cloth after filling the tank.
Any remaining urea solution will contaminate the forklift.
(Consumption of urea solution may vary per driving practices and
conditions.)
How to store urea solution
1. Make sure NOT to use the container of the following materials to
store urea solution.
→
Aluminum, Copper, Copper alloy, Non
alloy metal, Zinc coated metal(Galvanized steel)
Storage of urea solution shall comply with the following.
2. The container to store urea solution must be made of the follow-
ing materials only.
→
CR-Ni or Mo-Cr-Ni steel meeting the spec-
ifications of DIN EN 10088-1/2/3, Polypropylene, Polyethylene.
3. It is recommended that urea solution be stored indoors rather
than outdoors to prevent frosting, in a completely closed con-
tainer. Do not use remaining urea solution in the bottle unless it
has been completely closed.
Purity
1. The following cases will gravely affect or damage the emission
purification system:
−
Adding any detergent or liquid other than urea solution in the tank
−
Adding any additive to urea solution
−
Diluting urea solution with water
Summary of Contents for C40D
Page 2: ......
Page 6: ...iv ...
Page 16: ...1 4 Seat Belts Seat Belts ALWAYS BUCKLE UP Seat belts can reduce injuries ...
Page 30: ......
Page 90: ......
Page 109: ...PM Report Form 7 13 Section 7 Planned Maintenance and Lubrication ...
Page 126: ......
Page 136: ......