Packaging can be lifted or moved by lift trucks, cranes or overhead cranes. In case of
slinging, a second person must always take care of the load, in order to avoid dangerous
oscillations.
During loading and unloading operations, goods must be moved by appropriate vehicles
such as trucks, ships or fork lift.
At the moment the goods are delivered, verify immediately that all of the items specified
in the delivery notes are included.
If finding missing parts, possible defects or damages to the goods caused during the
transport you should immediately inform the person in charge, or the carrier.
Furthermore, during loading and unloading operations, goods must be handled as shown
in the picture. (Picture 2)
It is important to point out that the goods, during loading and unloading operations,
when moved by other than common lift trucks must be handled as shown in Figure 2.
The equipment should be stocked inside the warehouse, if stocked outside make sure
that the equipment stay off the water.
Use box tracks for ground transportation , use container when shipping.
Control box should be placed perpendicularly during the transport to prevent it to crash
against other goods.
Temperature range for machine storage: min -25ºC – max + 55ºC
PACKING, TRANSPORT & STORAGE
29
Summary of Contents for PE 6002
Page 1: ...clas com ÉLÉVATEUR ÉLECTRO HYDRAULIQUE 3T SCISSOR LIFT 3T DUAL CYLINDERS LOW RAISE PE 6002 ...
Page 23: ...PE 6002 23 DESSIN ÉCLATÉ DE L ÉLÉVATEUR APPENDIX ÉLÉVATEUR ÉLECTRO HYDRAULIQUE 3T ...
Page 26: ...PE 6002 26 ÉLÉVATEUR ÉLECTRO HYDRAULIQUE 3T ...
Page 51: ...PE 6001 DOUBLE SCISSOR LIFT 3T PE 6002 SCISSOR LIFT 3T DUAL CYLINDERS LOW RAISE 51 ...
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......