background image

BEFORE YOU BEGIN

 

Caution

 

This bath is heavy. To ensure safety, please obtain sufficient help to lift or 
move the bath carefully.

 

Important

 

Please make sure the following items are located and retained before the
wooden crate and other packing materials are discarded.

 

Pop-up waste 

Installation Manual 
Care & Cleaning 
Guide Warranty

 

Please make sure the floor fulfills the loading requirements and is perfectly
level.

 

Illustrations shown in this manual may not look the same as your actual

product but they are correct for this  installation.

 

2

Marbleform Bath - Installation V2_10/18

NOTE: This method statement has been prepared to the best of Claybrook’s 

knowledge and is subject to adjustments based on site conditions. 

Installer needs to assess the best suited conditions for mounting and use 
appropriate graded fasteners, equipment and aids

, complying to local industry 

and safety standards/regulations.

Summary of Contents for Orbit Bath 1300

Page 1: ...INSTALLATION MANUAL Marbleform Bath 1 Marbleform Bath Installation V2_10 18 ...

Page 2: ... floor fulfills the loading requirements and is perfectly level Illustrations shown in this manual may not look the same as your actual product but they are correct for this installation 2 Marbleform Bath Installation V2_10 18 NOTE This method statement has been prepared to the best of Claybrook s knowledge and is subject to adjustments based on site conditions Installer needs to assess the best s...

Page 3: ... in floor Level floor surface Side View Level floor surface Installation Recommendation It is recommended to place rubber mats on the floor where the bath will be installed to prevent the bath from slipping STEP 2 Carefully remove the top wooden board of the crate Drainage Recess in floor Rubbermat Optional Drainage 3 Marbleform Bath Installation V2_10 18 ...

Page 4: ... is wrapped in a protective film Leave this film wrap on the bath until the waste has been connected STEP 5 Carefully remove the bath from the wooden base Caution Please ensure there is sufficient help to lift and lower the bath into position 4 Marbleform Bath Installation V2_10 18 ...

Page 5: ...ed position and align the drainage and the waste as shown below Testthe water tightness of allconnections Top View Level floor surface Side View Drainage Waste Caution Do not over tighten the waste 5 Marbleform Bath Installation V2_10 18 ...

Page 6: ...erimeter edge with silicone sealant once the bath is positioned to prevent the bath from slipping Level floor surface STEP 8 Please protect the bath until all surrounding construction work is complete to avoid incidental damage Protective Cover Apply an acetic cured silicone between adjacent surfaces 6 Marbleform Bath Installation V2_10 18 ...

Page 7: ... 2014 Claybrook Interiors Ltd C SB IM 03 7 Marbleform Bath Installation V2_10 18 End ...