Repair or Warranty Contact
Clayton Associates, Inc.
•
1650 Oak Street
•
Lakewood, New Jersey 08701
•
P.+1-732-363-2100 F.+1-732-364-6084
www.DustlessMadeSimple.com
•
Sales@JClayton.com
Page 5
GETTING STARTED
2. Mount the Upright tubes
• Using the bolts from step 1, mount the Upright tubes to the tank
• Do not fully tighted the bolts
3. Mount the Pegboard Assembly
• Slide the Pegboard tubes (A) over the Upright tubes (B)
• Depress the pin in each Upright tube (B)
• Continue engaging the tubes until the pins lock into the pin holes.
Pin Hole
A
B
Pin