6
Installation
CENTRAL INSTALLATION
ADD-ON INSTALLATION
Duct Work Installation
DUCTWORK INSTALLATION
We strongly recommend that the hot air ductwork be installed by a home heating specialist. If doing the
installation yourself, before you decide which installation will best suit your needs, consult a qualified heating
technician and follow his recommendations as to the safest and most efficient method of installation.
This furnace can be installed in two ways, as a stand alone unit, or in series with an existing furnace.
SUPPLY AIR (HOT AIR) PLENUM
The warm-air supply duct shall be constructed of metal in accordance with NFPA 90B, 2-1.1. The plenums installed
to the furnace shall be constructed of metal in accordance with NFPA 90B, 2-1.3.
When installing this furnace the hot air plenum is to have a minimum height of 24” (610mm) if the top of the first
vertical section is not flush with the top of the first horizontal section of ductwork. If the top of the plenum is flush
with the top of the first horizontal section of ductwork then the minium height is 15” (381mm).
RETURN AIR (FRESH AIR)
The return (fresh) air intake on the furnace is on the rear of the unit. The ductwork must be mechanically
attached to the unit or blower kit box with sheet metal screws to ensure a proper operation.
STAND ALONE INSTALLATION
If installing this furnace as a stand alone unit, ensure all local codes and all instructions in this manual are followed,
including clearance to combustibles, floor protector specifications and safety warnings.
26.54”
Supply Air (Hot Air) Duct Work Outlet Size
Supply Air Plenum
Minimum Height Of 24”
Supply Air Plenum With
Minimum Height Of 15”