background image

Page 11 of 11 

 

Completing the Installation 

1.

 

Before finalizing installation, make sure the CleanCut Ultra-Low is in proper position and fully 
compressed. Press firmly and evenly on the CleanCut Ultra-Low to ensure proper placement. 

Thoroughly wipe tub area with isopropyl alcohol where the adhesive will bond and allow enough 
time for the isopropyl alcohol to flash off before applying the adhesive.  

Do not

 apply the isopropyl 

alcohol directly on the adhesive as it will prevent the adhesive from drying or curing. 

Do not

 use to 

clean or smooth your final bead. 

 

2.

 

It is necessary to caulk around the entire perimeter of the CleanCut Ultra-Low using the enclosed 

adhesive. Begin by using adhesive along the inside of the CleanCut Ultra-Low, one section at a 
time.  Begin on the left inside and complete the application process, before moving to the bottom 
inside, then the right inside. Complete the same steps on the outside. It is recommended that you 
wear gloves during this step to avoid direct exposure to the adhesive. 

 

3.

 

Run your gloved finger along the beads and wipe the excess on a folded paper towel.  Try to 
smooth the beads one-time only, as the adhesive becomes tacky to the touch quickly. 

 

4.

 

Underneath the bottom edges of the CleanCut Ultra-Low are a bit more difficult to see and the 
included angled nozzle should be used in completing this step. Use a small mirror to inspect the 
bead and to verify that all surfaces have been properly sealed. 

 

 

5.

 

It is also recommended to remove the stopper from the tub upon completion of the installation to 
prevent from accidentally filling the tub with water and, if desired, replace trip lever with a blank cap. 

 

6.

 

Spend some time at the end of the job to again clean up the tub and bathroom area. Upon 
completion, place a sign on CleanCut Ultra-Low warning not to use the tub for 2 days while the 
adhesive cures. 

 

 

IMPORTANT REMINDER – if completing the install on behalf of another, please leave the 
warranty and care & use information with the end-user at the conclusion of the installation. 

 

 

The CleanCut Ultra-Low installation is now complete.

 Safeway Safety Step, LLC (DBA CleanCut) 

sincerely thanks you for your interest in the CleanCut Ultra-Low and looks forward to assisting you in any 
way possible. Visit our website at www.cleancutbath.com for video installation instructions and answers to 
frequently asked questions, or call us toll-free at 877-882-7837 with any questions or concerns.

 

 

Summary of Contents for ULTRA-LOW

Page 1: ...CLEANCUT ULTRA LOW INSTALLATION GUIDE COPYRIGHT 2020 SAFEWAY SAFETY STEP LLC DBA CleanCut All Rights Reserved Reproduction or Distribution of this Installation Manual is Strictly Prohibited...

Page 2: ...E OCCURRED DURING INSTALLATION OR SUBSEQUENT USE OF THE CLEANCUT ULTRA LOW FAILURE TO FOLLOW THE INSTRUCTIONS IN THIS INSTALLATION MANUAL SHALL VOID ANY WARRANTY GIVEN WITH RESPECT TO THE CLEANCUT ULT...

Page 3: ...allation kit the following tools and materials are recommended to have on hand for installation Additional Tools Materials Butane Torch Cardstock Paper Caulking Gun Chisels Deburring Tool i e drywall...

Page 4: ...nsiderations for cutting cast iron tubs in the following section 4 Confirm that the CleanCut Ultra Low will fit the bathtub First measure the top rail width measurement as well as the width measuremen...

Page 5: ...gs with fitting the CleanCut Ultra Low and reduces risk of injury 5 After the cut out section of the tub has been removed take a few moments to clean the area in and around the tub Using a dustpan and...

Page 6: ...side of the tub Mark this tracing Right 3 Cut out the paper templates with scissors making sure to keep to the inside of the tracings Figure 2 FIGURE 2 4 It is time to transfer the shape of our cut t...

Page 7: ...Ultra Low The inside of the tub may be irregular in shape so measurements for the inside line must be made every 3 from one end of the CleanCut Ultra Low to the other Once completed use your yard sti...

Page 8: ...the vertical ends of the CleanCut Ultra Low Remember to tilt your blade on each corner cutting all areas that have been marked 8 Place the CleanCut Ultra Low into position Remember the face with the...

Page 9: ...he conditions present during your installation For example for wooden sub floors begin by screwing or adhering with included adhesive a treated 2x4 directly to the sub floor to serve as a base for the...

Page 10: ...hieved Secure both sides of the support structure by placing two screws in each side Figure 8 7 Apply adhesive to the tops of the 2x4 s that are already in place in the channel if they are needed for...

Page 11: ...th the beads one time only as the adhesive becomes tacky to the touch quickly 4 Underneath the bottom edges of the CleanCut Ultra Low are a bit more difficult to see and the included angled nozzle sho...

Reviews: