Page 100 399G169 Rev B 27 April 2016
13
Powering your system
13.1
Powering the FreeSpeak II™ Base
Use two power supplies according to preference:
•
Mains power lead (internal power converter)
•
DC connector. External wallwart power lead.
Use one power connector or both to guard against one failing.
13.2
Powering wireless beltpacks
Beltpacks are powered by Li-ion battery. Drop-in battery charger supplied.
Battery power status is viewed from:
•
Base Station menu screens
•
Beltpack menu screens
•
Core Configuration Manager (CCM).
For more information, see: Battery Charger Quick Start Guide (PDF
available from Clear-Com
, LLC
website).
Note:
You can also power beltpacks using standard AA batteries for convenience. In
situations where Li-ion batteries are prohibited, you can also use nickel metal
hydride batteries (NiMH) but will need to set battery type so battery life
diagnostics are accurate.
13.3
Power 2-wire beltpacks from the Partyline
2-wire Partyline beltpacks can take power from the Partyline:
•
FreeSpeak base power: 60 watts supply = 250 mA to Partyline
•
~10 beltpacks per pair of ports, max 20 beltpacks per base.
Note:
The Partyline power operates over a pair of ports
To enable power to the Partyline go to Ports, 2-wire in the CCM or in Base
front menu screens.
13.4
Powering the transceiver antennas
•
Directly (DC in power connector)
or
•
From the FreeSpeak II™ Base
Summary of Contents for FreeSpeak II
Page 31: ...Page 31 399G169 Rev B 27 April 2016 How to set cable length in the CCM 1 ...
Page 32: ...Page 32 399G169 Rev B 27 April 2016 How to set cable length from the Base menus ...
Page 65: ...Page 65 399G169 Rev B 27 April 2016 ...
Page 70: ...Page 70 399G169 Rev B 27 April 2016 Save settings from the CCM ...
Page 72: ...Page 72 399G169 Rev B 27 April 2016 Fix a Role in the CCM ...
Page 73: ...Page 73 399G169 Rev B 27 April 2016 Fix a Role from the Base menu screens ...
Page 80: ...Page 80 399G169 Rev B 27 April 2016 ...
Page 85: ...Page 85 399G169 Rev B 27 April 2016 How to program a Talk key to the Group ...
Page 89: ...Page 89 399G169 Rev B 27 April 2016 ...
Page 90: ...Page 90 399G169 Rev B 27 April 2016 Edit Beltpack Roles from the Base Station ...
Page 92: ...Page 92 399G169 Rev B 27 April 2016 Change Base Station key assignment from the Base Station ...