303.872.4477 support@clearcomfort.com clearcomfort.com
11
INSTALLING THE CLEAR COMFORT
MANIFOLD INJECTION
Figure 4: Full System Diagram With Manifold Injection
NOTE:
For full system diagrams that include additional sanitation
systems integrated with the Clear Comfort system,
see pages 18 and 19.
FULL SYSTEM DIAGRAM: MANIFOLD INJECTION
NOTE:
The Manifold injection is the preferred CCW100 installation
method. For other U-bypass diagrams and instructions, please visit:
clearcomfort.com/residential-manual
Summary of Contents for CCW100
Page 27: ......