FieldSmart
®
Fiber Active Cabinet (FAC) 400
Installation Manual
_________________________________________________________
Proprietary Information: Not for use or disclosure except by written agreement with Clearfield.
106
Route the power cord to the left compartment wall. Plug the power cord into the supply cable located on the
inside wall.
Mount the thermostat to the side of the battery tray as follows:
a.
Route the thermostat wire to the outer left side of the battery tray.
b.
Attach the thermostat to the two mounting studs on the side of the tray.
c.
Install a nut onto each of the two mounting studs to secure the thermostat in place.
After batteries are installed, switch ON the 15A Battery Heater breaker at the AC load center to apply power.
Note:
For battery installation instructions, see Installing Batteries.
Replace the battery compartment door.
Step 3:
Step 4:
Step 5:
Step 6:
Unpack the battery heater from the shipping packaging, and then remove the upper and lower battery
compartment doors. See Operating Cabinet Doors for instructions.
Install the battery heater into the battery tray in the riser compartment as follows:
a.
Facing the battery compartment, orient the battery heater with its heating element and alignment tabs on the
bottom (face down) and the power and thermostat cords on the left side.
b.
Place the heater into the battery tray, aligning the heater tabs into the slots in the tray.
c.
Attach the heater ground wire to the two mounting studs located at the center rear of the battery tray and
heater using the supplied Keps nuts and star washers.
Install the battery heater jumper cable as follows:
a.
Plug the jumper cable’s upper power connector into the supply cable located in the upper battery
compartment on the left inside wall.
b.
Plug the jumper cable’s upper heater connector into the battery heater installed in the upper
battery compartment.
c.
Route the jumper cable’s lower power connector into the riser compartment through the left rear hole of the
upper battery compartment, and insert the connector into the panel mount bracket on the left inside wall.
Step 1:
Step 2:
Step 3:
To install a battery heater in a secondary 60 Ah battery compartment (riser)
Note:
Install the battery heater in the (upper) battery compartment before installing the battery heater in the riser.