107
FieldSmart
®
Fiber Active Cabinet (FAC) 400
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • techsupport@clfd.net
Manual 020419 REV A - Feb 2019
d.
Plug the power cord from the riser’s battery heater into the jumper cable’s lower connector (inserted into
the panel mount bracket in step 4c).
Mount the thermostat to the side of the battery tray as follows:
a.
Route the thermostat wire to the outer left side of the battery tray.
b.
Attach the thermostat to the two mounting studs on the side of the tray, as shown above.
c.
Install a nut onto each of the two mounting studs to secure the thermostat in place.
After batteries are installed, switch ON the 15A Battery Heater breaker at the AC load center to apply power.
Note:
For battery installation instructions, see Installing Batteries.
Replace the battery compartment doors.
Step 4:
Step 5:
Step 6: