19
FieldSmart
®
Fiber Active Cabinet (FAC) 400
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • techsupport@clfd.net
Manual 020419 REV A - Feb 2019
User-Supplied Items
Supply the following items for cabinet installation.
Tools
Bring the following tools to the installation site:
• Power drill with universal socket and screwdriver bit sets
• Socket wrench/nut driver set (standard)
• Box wrench set (standard)
• Screwdriver set (standard)
• Beam Level
• Insulated needle-nose pliers
• Wire stripper
• Compression crimping tool
• Fiber cleaver
• Fiber splicer
• Modular MS2 or 710 splicing tool
• RB Razor-Sharp Cutting Edge knife, or another similar tool
Materials
Bring the following materials to the installation site:
• Leveling shims
• Silicone sealant
• MS2 or 710 connectors for copper line splicing
• Strain relief for #6-8 AWG wiring.
Equipment
Bring the following equipment to the installation site:
• Digital multi-meter
• Optical power meter
• Digital multi-function test set