3
FieldSmart
®
Fiber Active Cabinet (FAC) 400
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • techsupport@clfd.net
Manual 020419 REV A - Feb 2019
Installing a Foundation Vault
50
Foundation Vault Requirements
50
Preparing the Site
53
Installing the Foundation Vault
54
Chapter 4: Installing the Cabinet
55
Unpacking the Cabinet
56
Operating Cabinet Doors
57
Preparing the Cabinet for Installation
59
Installing the Cabinet on a Concrete Pad
60
Installing the Cabinet on a Wall or H-Frame
63
Installing the Cabinet on a Pole: Local Power with 60 Ah Battery
Base(s)
65
Installing the Cabinet on a Foundation Vault
67
Removing the Lifting Details
69
Chapter 5: Installing Local AC Power
70
Installing the Cabinet Ground Connection
71
Installing AC Power (220-240 VAC)
73
Chapter 6: Installing and Splicing Outside Plant Cables 75
Bonding Cable Sheaths
76
Installing Fiber Cable
77
Installing Outside Plant Fiber Cable
77
Splicing Fibers
79
Connecting Fibers to the Equipment
79
Installing Metallic Cables
80
Installing Outside Plant Metallic Cables
80
Splicing Metallic Cables
81
Installing 5-Pin Protection Modules
82
Sealing Cable Entry Locations
82
Chapter 7: Turning Up the Cabinet Power System
83
Turning Up the Power System
84
Checking the Ground Connection
84
Checking the AC Power Supply Voltage
85
Installing the Rectifier Modules (Alpha Cordex Rectifier
Option)
86
Installing and Testing Batteries
88