Preparing the Site
Installing the Pole-Mount Kit
At the installation site, verify the following:
• The pole is installed and plumb.
• The pole meets the cabinet mounting requirements.
Trench out conduit paths to the pole from the cable feeder location.
Place the cable conduits into the conduit trench. At the pole, allow the conduit to extend above
ground to the approximate height of the base platform. Refer to the pole mounting guidelines for
conduit sizes and locations.
Route the earth ground wire through the conduit trench (from the ground electrode). Pull six feet of
wire above ground and position it adjacent to the pole.
Backfill the conduit trench with soil.
Step 1:
Step 2:
Step 3:
Step 4:
Step 5:
Prepare the site for installation of a pole-mounting kit. A general practice is described below for reference. Adapt the instruc-
tions as needed for local requirements, practices, or conditions.
To prepare the site for a pole mount installation
Install the Clearfield pole-mount kit for local power
configurations with a 60 Ah battery base(s) onto a pole or
post, as described below. Adapt the instructions as needed
for local requirements, practices, or conditions.
The primary components of the kit are identified at right.
Note:
The front and rear mounting brackets are
interchangeable.