FieldSmart
®
Fiber Active Cabinet (FAC) 400
Installation Manual
_________________________________________________________
Proprietary Information: Not for use or disclosure except by written agreement with Clearfield.
62
Pull the earth ground wire into the cabinet or riser through one of the cable entry ducts.
Anchor the cabinet or riser to the pad as follows:
Site-cast pads with anchor studs:
a.
Get the four hex nuts, four flat washers, and four lock washers from the installation kit.
b.
Install one flat washer, lock washer, and hex nut onto each of the four anchor studs.
c.
Tighten the hex nuts to secure the cabinet or riser to the pad.
Pre-cast pads with threaded inserts:
a.
Get four anchor bolts, four flat washers, and four lock washers from the installation kit.
b.
Install one flat washer, lock washer, and anchor bolt into each of the four threaded mounting inserts.
c.
Tighten the bolts to secure the cabinet or riser to the pad.
Verify that the doors open and close freely. If necessary, use shims to level the cabinet or riser.
Apply silicone caulking to the bottom perimeter of the cabinet or riser.
Step 5:
Step 6:
Step 7:
Step 8: