Connect the battery power cables in the upper battery compartment as follows:
a.
Remove the protective caps from the cable ring lugs.
b.
Attach the black cable to the positive (+) terminal post at the positive end of the string.
c.
Attach the red cable to the negative (-) terminal post at the negative end of the string.
ALERT!
Check all connections carefully to verify correct wiring polarities.
d.
Install the temperature sensor cable lug onto the string’s negative (-) terminal post.
e.
Tighten the hardware on the terminal posts to the torque specified by the manufacturer.
Install three jumper cables between the battery terminal posts using the supplied flat washers, split lock
washers, and bolts.
Check for correct polarity and test the battery connection between the negative and positive battery leads
(as described in step 7).
Install the protective covers (manufacturer-supplied) over each battery terminal.
Reinstall the rectifier module removed in step 6.
Verify that the cabinet heat exchanger fans are running (if the temperature is high enough).