At the AC load center, do the following:
a.
Set the Main breaker to OFF. The heat exchanger fans should continue to run.
b.
Set the Main breaker to ON and verify that power restores to the rectifier shelf.
Slide the battery strings into the upper compartment battery tray.
Install a lower retainer for each string as follows:
a.
Slide the lip of the retainer flush against the bottom edge of the compartment, and then align the holes at the
right and left ends of the retainer with the counterpart mounting holes on the compartment.
b.
Tighten the thumb screws on the compartment to secure the retainer in place.
Note:
If you are using the optional seismic protection kit, install the front seismic bracket and stiffener above
the lower retainer.
Replace the battery compartment doors.
Step 17:
Step 18:
Step 19:
Step 20: