97
FieldSmart
®
Fiber Active Cabinet (FAC) 400
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • techsupport@clfd.net
Manual 020419 REV A - Feb 2019
Chapter 8: Installing Equipment, Options and Adding Capacity
This chapter describes how to install optional equipment and components into the cabinet, including expansion components
to increase system capacity. The cabinet allows for modular growth of line capacity and supports field installation of all
factory options.
Topics Covered
This chapter covers the following topics:
• Installing a protection block mounting frame
• Installing a protection block
• Installing a cross-connect panel
• Installing a 60 Ah battery compartment riser
• Installing a battery heater
• Installing a seismic protection kit for batteries
• Installing a generator connector
• Installing an Ethernet over Copper (EoCu) trunking unit
•
Installing fiber management options