135
FieldSmart
®
Fiber Active Cabinet (FAC) 900
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • techsupport@clfd.net
Manual 020420 REV B - April 2019
Step 5:
Step 6:
Feed twine through the conduit as follows:
a.
Hold the conduit vertically and feed approximately 20 feet of twine through the conduit.
b.
Secure the twine to the inside of each conduit fitting with tape.
(Skip this step if your cabinet was shipped with the splitter integration kit installed) Install the conduit mounting
bracket in the cabinet as follows:
a.
Locate the conduit mounting bracket (set aside previously).
b.
Position the bracket against the back of the front equipment rail, under the left side of the AC load center or
junction box.
c.
Align the bracket mounting holes with the counterpart holes in the rail.