Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • techsupport@clfd.net
20
FieldSmart
®
Fiber Scalability Center (FSC)
Installation Manual
_________________________________________________________
Manual 009246 REV J - Feb 2020
Preparing the Enclosure Base for Installation
Locate the enclosure base and remove any packaging materials. They are typically assembled and packaged on top of
FieldSmart Cabinets. There are both a 4” and 12” riser kit available to each style cabinet. All have pre-cut vent holes and the
12” has an access door.
288 PON, 432 Cross-Connect, Hub Collapse Cabinets:
4”
12”
Access door facing rear of cabinet
4”
12”
Access door facing front and rear
4”
12”
Access door facing front and rear
432 PON Cabinets:
576 PON, 864 Cross-Connect, 1152 PON, 1,728 Cross-Connect Cabinets:
Cabinet Mounting