Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • techsupport@clfd.net
26
FieldSmart
®
Fiber Scalability Center (FSC)
Installation Manual
_________________________________________________________
Manual 009246 REV J - Feb 2020
Mounting Enclosure on Base
Locate the hardware package shipped with the enclosure. Locate the (4) bolts, washers and lock washers. Assure the
enclosure is oriented properly to the base and then insert the bolts through holes in the corners of the enclosure. Insert all
four bolts before tightening them with a wrench.
Check for and remove all tape, cardboard and foam supports used during shipping.
Use the J-bolts supplied in the bolt kit to attach the cabinet base to the vault lid. J-bolts are installed from the bottom of the
lid and are “hooked” into one of the ribs on the underside of the vault lid. Secure with washer, lock washer and nut.