YOU MUST READ THIS DOCUMENT BEFORE YOU
BEGIN TO ASSEMBLE THE SHELTER.
Thank you for purchasing this ClearSpan™ greenhouse.
When properly assembled and maintained, this product
will provide years of reliable service. This instruction
manual includes helpful hints and important information
needed to safely assemble and properly maintain the
shelter. Please read these instructions
before
you begin.
If you have any questions during the assembly, contact
Customer Service at 1-800-245-9881 for assistance.
SAFETY PRECAUTIONS
•
Wear eye protection.
•
Wear head protection.
•
Wear gloves when handling metal tubes and cables.
•
Use a portable GFCI when working with power tools
and cords.
•
Do not climb on the shelter or framing during or after
construction.
•
Do not occupy the shelter during high winds,
tornadoes, or hurricanes.
•
Provide adequate ventilation if the structure is
enclosed.
•
Do not store hazardous materials in the shelter
without proper ventilation.
•
Provide proper ingress and egress to prevent
entrapment.
ANCHORING INSTRUCTIONS
Prior to assembling this shelter, please read the MUST
READ document included with the shipment.
WARNING: The anchor assembly is an integral part of
the shelter construction. Improper anchoring can cause
shelter instability and failure of the structure to perform
as designed. Failing to anchor the shelter properly will
void the manufacturer's warranty and can cause serious
injury and damage.
LOCATION
Choosing the proper location is an important step before
you begin to assemble the structure. The following
suggestions and precautions will help you determine
whether your selected location is the best location.
•
Never erect the structure under power lines.
•
Identify whether underground cables and pipes are
present before preparing the site or anchoring the
structure.
•
Location should be away from structures that could
cause snow to drift on or around the building.
•
Do not position the building in a place where large
loads such as snow and ice, large tree braches, or
other overhead obstacles could fall.
SITE
After choosing a location, proper preparation of the site
is essential. The following site characteristics will help
ensure the integrity of the structure.
•
The site must be level to properly and safely erect
and anchor the structure.
•
If the site is not level, use footings to provide a
secure base to assemble the structure. Pre-cast
concrete blocks, pressure-treated wood posts, or
poured footings are all acceptable when properly
used. (Some shelters use ground posts.)
•
Drainage: Water draining off the structure and from
areas surrounding the site should drain away from
the site to prevent damage to the site, the structure,
and contents of the structure.
WARNING: The individuals assembling this structure are
responsible for designing and furnishing all temporary
bracing, shoring and support needed during the
assembly process. For safety reasons, those who are
not familiar with recognized construction methods and
techniques must seek the help of a qualified contractor.
ASSEMBLY PROCEDURE
Following the instructions as presented will help ensure
the proper assembly of your shelter. Failing to follow
these steps can result in an improperly assembled and
anchored shelter. The steps outlining the typical
assembly process are as follows:
Visit www.ClearSpan.com for additional products and customer assistance.
1 of 24