7. With all ropes attached to the cover conduit, lift the
conduit and carry the cover toward the base of the
greenhouse frame.
8. Toss the ropes over the frame and pull the cover
into position on the greenhouse frame.
Diagram above is use to show the main cover
installation only. End panels and other frame members
are not shown.
9. Once the main cover is pulled into position, center
the cover on the frame and loosely secure the ends
of the cover to the ratchets attached to the front and
back end wall frame tubes.
ATTENTION: Do not tighten the straps at this time.
Diagram may show a slightly different application.
10. Place the D-Ring and straps on the ground next to
the rafter they will be attached to. The D-Rings and
straps are placed evenly along the same side of the
frame.
In the above diagram D-Rings and straps are attached
on the rafters identified by the arrows.
11. On the side where the D-Rings and straps are
located, lift the cover skirt and cut a slit through the
main cover pocket at the rafter position where the D-
Ring and straps are to be installed.
12. Thread the D-Ring and strap assembly through the
slit in the cover pocket, wrap it around the cover
conduit, and attach the strap assembly to the rafter
leg.
Visit www.ClearSpan.com for additional products and customer assistance.
20 of 24