CLEARSPAN
™
GREENHOUSES
18
Revision date: 07.29.14
INSTALL THE END WALL FRAME (continued)
34. Locate the 100356 lower roller assembly and remove
the roller, bushings, screws, bolt and nuts.
35. Looking at the rough door opening of the assembled
end wall, secure the angle bracket in the lower-left
corner of the opening as shown below.
NOTE:
Use FA4482B Tek screws. Do not use the holes
marked with an X in the photo above.
If using the screws supplied with the roller assembly,
drill two (2) pilot holes into the frame and attach roller
assembly using two (2) screws.
36. Reattach the roller and related parts to the angled
bracket attached to the end wall frame.
NOTE:
Do not tighten the roller assembly at this time. It
is adjusted and tightened when the door is installed.
X
X
37. Repeat the steps to attach the remaining roller
assembly to the lower-right corner of the rough door
opening. View is from outside the frame.
38. Continue with installing the framing for the back end
wall.
INSTALL THE BACK END WALL FRAME
The end wall framing for the back of the greenhouse is
assembled in the same way as the front end wall.
If the back wall includes the optional double door kit, repeat
the End Wall Installation procedure and install the framing
for the remaining end wall.
CONSULT THE QUICK START SECTION FOR
ADDITIONAL FRAMING INFORMATION.
If the back wall does not include an optional double door
kit, install vertical frame members in the framed opening.
See the diagram below.
1. Join and cut the tubes to the required length and attach
to the end wall framing.
2. Attach the frame support at the top and bottom as
previously described.
3. Continue with installing the end panels.