CLEARSPAN
™
POLY BUILDINGS
12
Revision date: 05.19.09
NOTE:
Verify that the bolt heads are to the outside of
the shelter and tighten the nuts.
3. Install the remaining struts and tighten all band clamp
bolts.
4. Secure each band clamp to the purlin and rafter using
a Tek screw for each connection.
5. Return to each purlin joint and secure using a Tek
screw.
90°
Strut
FRAME ASSEMBLY (CONTINUED)
2. Remove the bolts and attach a strut between the band
clamp on the purlin and the band clamp on the end
rafter. Position the strut so that it forms a triangle as
shown below.
Actual strut and position may vary.
ANCHOR THE SHELTER
At this point, anchor the frame. Once the frame is anchored
properly, continue with these instructions.
WARNING
: You must anchor the shelter as described
in the MUST READ document.
FAILING TO PROPERLY ANCHOR THE SHELTER
WILL RESULT IN DAMAGE TO THE SHELTER AND
MAY CAUSE PERSONAL INJURY.
READ THE MUST READ DOCUMENT TO PROPERLY
ANCHOR THE SHELTER.
Strut Installation Procedure
1. After the rafter assembly is complete, verify that the
band clamps are in the proper location. See diagram
below.
Positions of band clamps depend on the rafter spacing
and may differ slightly from what is shown.
End Rafter
First Inside Rafter
Band Clamp
Lower Purlin
Space below is reserved for customer notes.