CLEARSPAN
™
POLY BUILDINGS
6
Revision date: 05.19.09
Interior Rafter
End Rafter
Purlin
20'
center-to-center
Frame length may differ from actual frame.
Strut
OVERVIEW
This section describes assembling your storage building.
For details of each assembly procedure, consult the
Quick Start Guide and the individual sections of these
instructions. See illustration below to identify main parts of
shelter.
1. Layout the site and identify the required parts for each
assembly procedure.
2. Assemble all rafters.
3. Assemble and anchor the frame.
4. Prepare and install the main cover.
ClearSpan
™
Econoline Storage Building