CLEARSPAN
™
POLY BUILDINGS
14
Revision date: 06.18.09
CABLE PLACEMENT
The diagram and inserts below identify the placement and
proper way to attach the cable assemblies to the building.
Do not tighten the cables until the frame is properly and
securely anchored to the site as described in the Must
Read document.
Carriage Bolt
NOTE:
The positions of the cable assemblies are identical for the opposite
side and the remaining end of the building that are not shown.
Consult the
Side Profile Diagram in the Quick Start section for rafter spacing and cable
locations
.
View is from inside
the shelter.
Apply duct tape over
cables on end rafters
to protect the main
cover.
Carriage bolt runs through rafter
and top center purlin on the
6th or 7th rafter (depending on
spacing) at each end.
View is from
inside the
shelter.
Attach the band clamp (103856) above the lowest
pipe strap (QH1070) on the end rafters only. Once
the cable is attached and the clamp is tightened,
secure the clamp to the rafter using a Tek screw.
103856
QH1070
ATTENTION:
Install
a carriage bolt in this
location at both ends of
the shelter.
Drill through the rafter
and purlin to install the
bolt.
Tape over cables to
protect cover.
Top, Center
Purlin
Top, Center
Purlin