17
CLEARSPAN
™
POLY BUILDINGS
Revision date: 06.18.09
PREPARE MAIN COVER
Gather the parts:
• Pipe 1.66" x 99" swaged
• Pipe 1.66" x XX" plain: The XX refers to the length of the plain pipe needed to reach the end of the frame and to
complete the conduit. Consult the Side Profile Diagram in the Quick Start section of these instructions for your
building to identify this pipe length.
• Main cover
• Tek screws
Assembly Procedure
NOTE:
When handling the main cover and setting it in position, do not pull on the end straps. They will pull out of the
cover.
Do not insert any cover conduit into a cover pocket that includes a pre-installed strap.
WARNING:
To prevent damage to the cover and to prevent serious personal injury, DO NOT attempt to install the
main cover on windy days.
1. Assemble two main cover conduits. Start each cover conduit assembly with one plain pipe and add swaged pipes to
arrive at the length of the frame. Once assembled, the cover conduits are inserted into the side pockets of the main
cover. The conduits are used to tighten and secure the main cover to the frame.
Consult the Side Profile Diagram in
the Quick Start section for pipe identification.
2. After assembling the cover conduits, locate the main cover and unfold it on a clean, smooth surface against the pony
wall. Unfold the main cover with the inside surface facing up and the straps positioned at the front and back of the
pony wall.
a. Locate all sections of pipe needed to assemble
the cover conduit.
b. Insert the swaged end of each pipe into the
plain end of another pipe until the conduit is
assembled.
c. Secure each pipe joint with a Tek screw.
d. Use duct tape to tape over each Tek screw.
3. Align the cover ends with the front and back of the shelter and insert one cover conduit into each side pocket of the
main cover.
NOTE:
Shelter shown above may be of a different style or length than actual shelter.
4. Continue by pulling the cover up and onto the frame.
WARNING:
To prevent damage to the cover and to prevent
serious personal injury, DO NOT attempt to install the main
cover on windy days.
Cover Conduits
Cover
Ends w/
Strapping
Stretch Pockets
(See note above.)
Side Pocket
Side Pocket
NOTE:
Stretch pockets are
found on covers for buildings
longer than 48'.