16
Revision date: 05.13.10
C
Ground Level
Rope or
Cable
FRAME ASSEMBLY (continued)
Set the next rafter in place, secure it to the ground posts or rafter legs, and brace in place as needed.
6.
Take the next purlin and place the mounting holes over the splice studs and secure with the 1/4" nuts.
7.
Take one 108504 eyebolt, FAMA38B lock washer, and a 3/8" nut (FALB04B) and attach the eyebolt to the splice of
8.
the third (3rd) rafter as shown (C). Position the eye of the bolt toward the end rafter for the cable installation.
Frame Assembly
C
DO NOT secure this end of the ridge
purlin to the rafter at this time. Ridge
purlin is secured to the rafter in the
following steps.
Ridge
Purlin
Overlap ridge purlins and secure
in place using 1/4" nuts.
Diagram above shows how to connect the next purlin at
the same splice. Use one set of 1/4" nuts to secure both
purlins.
108504 eyebolt, FAMA38B
lock washer, and 3/8" nut