Baseboard Installation
BASEBOARD INSTALLATION
Gather the parts:
2" x 6" or treated or recycled plastic lumber
•
(supplied
by customer)
5/16" x 5" carriage bolts (FAH325B)
•
5/16" nuts (FALB32B)
•
The following procedure describes one way to install the
required baseboards (drop-down curtain). (Attaching
baseboards to frames with roll-up sides is
strongly
recommended
.) The size and type of the baseboard you
choose may require the use of alternative steps.
When properly installed, baseboard runs the length of the
frame at ground level.
The baseboard is supplied by the
customer.
On the outside of the frame, attach the first baseboard
to the rafter using two (2) 5/16" x 5" carriage bolts and
nuts. Countersink bolt heads if needed.
Continue adding
baseboards to complete the first run.
Splices are made between posts as shown in the drawing
below. Use a short section of baseboard to secure
separate baseboards at a splice. See diagram below.
Repeat steps to install the second run of baseboards on
the remaining side of the frame.
NOTE:
The boards should be at ground level or slightly
into grade to prevent the shelter from sinking and are
required to attach the lower edge of a drop-down curtain if
equipped.
After installing the baseboards, continue with these
instructions.
Ground Level
Ground
Level
Inside of
Shelter
Outside of
Shelter
5/16" Nuts
(FALB32B)
Splice
5/16" x 5"
Carriage Bolts
Ground Level
Ground Posts and Baseboard
Baseboard
Ground Level
Rafter Feet and Baseboard
Baseboard
The above diagrams present examples only. Actual installation
depends on customer-supplied materials and other factors.