Important Information
YOU MUST READ THIS DOCUMENT BEFORE YOU
BEGIN TO ASSEMBLE THE SHELTER
.
Thank you for purchasing this ClearSpan™ greenhouse.
When properly assembled and maintained, this product
will provide years of reliable service. These instructions
include helpful hints and important information needed to
safely assemble and properly maintain the greenhouse.
Please read these instructions
before
you begin.
If you have any questions during the assembly, contact
customer service for assistance.
SAFETY PRECAUTIONS
Wear eye protection.
•
Wear head protection.
•
Wear gloves when handling metal parts.
•
Use a portable GFCI (Ground Fault Circuit Interrupter)
•
when working with power tools and cords.
Do not climb on the frame during or after construction.
•
Do not occupy the structure during high winds,
•
tornadoes, or hurricanes.
Provide adequate ventilation if the structure is
•
enclosed.
Do not store hazardous materials in the structure.
•
Provide proper ingress and egress to prevent
•
entrapment.
LOCATION
Choosing the proper location is an important step before
you begin to assemble the structure.
The following suggestions and precautions will help you
determine whether your selected location is the best
location.
Never erect the structure under power lines.
•
Identify whether underground cables and pipes are
•
present
before
preparing the site, setting ground
posts (if equipped), or anchoring the structure.
Location should be away from structures that could
•
cause snow to drift on or around the building.
Do not position the structure where large loads
•
such as snow and ice, large tree branches, or other
overhead obstacles could fall.
Always check local building codes before you begin
•
and follow codes as instructed.
SITE
After choosing a location, proper preparation of the site is
essential. Follow the information below.
A level site is required
•
. The site must be level to
properly and safely erect and anchor the structure.
If the site is not level, use footings to provide a secure
•
base to assemble the structure. Pre-cast concrete
blocks, pressure-treated wood posts, or poured
footings are all acceptable when properly used.
(Some shelters use ground posts or rafter feet.)
Drainage: Water draining off the structure and from
•
areas surrounding the site should drain away from the
site to prevent damage to the site, the structure, and
contents of the structure.
WARNING:
The individuals assembling this structure
are responsible for designing and furnishing all
temporary bracing, shoring and support needed
during the assembly process. For safety reasons,
those who are not familiar with recognized
construction methods and techniques must seek the
help of a qualified contractor.
DOUBLE-LAYER FILM INSTALLATION
Greenhouses equipped with a double-layer film include
a layer that is Infra Red (IR) Retention film.
IMPORTANT!
During cover installation, the IR film
must be installed first! Examine the film and install
it according to the instructions printed on the film.