40
Revision date: 05.13.10
Film Cover Installation with Roll-Up Sides
INSTALL MAIN COVER
Gather the parts:
Main covers and inflation fan kit
•
U-Channel spring (#102198) for side U-channel
•
Coated end cap spring (#108536) for end cap
•
Ropes long enough to reach over the frame (provided
•
by customer)
Box cutter or utility knife
•
Assembly Procedure
After the poly latch U-channel is attached to the frame,
unpack the main cover and pull into place. Ropes or
straps are typically used to pull the main cover onto and
over the frame.
WARNING:
To prevent damage to the cover and to
prevent serious personal injury, DO NOT attempt to
install the main cover on windy or stormy days.
The steps that follow describe one way to complete this
process.
CUTTING THE COVER FILM: If the film for the main
covers is shipped as a single roll, unfold or unroll the film,
cut a section for the first cover that is the length of the
greenhouse plus two (2) additional feet
.
Take the cover film and position it along the base of
1.
one side of the building.
NOTE:
Unfold the cover and locate the leading edge.
The frame shown in the photos differs from actual
frame. Procedure is the same
.
Along the edge, make small holes in the cover at
2.
evenly spaced intervals and tie rope or straps to
the cover.
If you do not want to cut holes in the
material, clamp self-locking, duck-billed pliers
to the cover and tie ropes or straps to the pliers.
Photos show tying ropes to the cover. Pliers are not
shown.
NOTE:
The ropes or straps must be long enough to
reach over the top of the building to the other side.
Long buildings require additional ropes to prevent
tearing the main cover when it is pulled into place.
Keep the holes, used to attach the rope or straps,
near the edge of the material and below where the
cover will be secured to the U-channel.
After tying the ropes to the main cover, throw the
3.
ropes over the top of the building and pull the cover
into place.
IMPORTANT:
To prevent damage to the main cover
during installation, additional personnel and lifts may be
needed.
Photo shows the cover film in position to pull over the
building.
Clamp self-locking,
duck-billed pliers along
the cover edge, tie
ropes or straps to the
pliers, and then pull
cover over the frame.
Consult the Spec Sheets for cover identification. The
greenhouse is equipped with double-layer main cover and
an inflation fan kit. One cover is pulled into position and
anchored to the frame, then the inflation kit is installed,
and finally the last main cover is attached.