41
Revision date: 05.13.10
Film Cover Installation with Roll-Up Sides
Move to the other end of the building, pull the cover
7.
tight, and repeat the steps to secure the cover in the
end cap channel.
After the cover is stretched end-to-end and secured,
8.
move one side of the building and install the
102198
U-channel spring
into the U-channel to anchor the
cover to the first side.
Use the top channel for cover.
NOTE:
Begin at one end of the U-channel and work
toward the other. Another option is to begin at the
middle of each side and work toward each end.
Maintain an even length as working along the side.
The final stretching of the cover will take place when
the last side is secured.
After securing the first side, move to the remaining
9.
side, stretch the cover, and secure it in place.
NOTE:
Pull the cover tight as the spring is inserted
into the U-channel.
Trim the excess cover material if desired.
10.
INSTALL MAIN COVER (continued)
Center cover side-to-side and end-to-end. Some
4.
film covers include additional material for the width
due to standard material dimensions. This film can
be removed and recycled, or it can be used by the
customer.
IMPORTANT:
To prevent damage to the main cover
during installation, additional personnel and lifts may
be needed.
Once the main cover is in place and centered, begin
5.
at the peak of one end and install
108536 coated end
cap spring
into the end cap channel to secure the
cover.
Do not use the 102198 spring.
ATTENTION:
Ensure that enough cover material
is present to lock into the end cap channel. The
cover material is cut longer/wider than is required
to cover the building. For easier anchoring, allow
approximately 10" to extend past the edge of the end
rafter as the cover is anchored into place. Remove the
ropes after the cover is secure.
Continue down both edges of the first end rafter until
6.
the entire length of the end of the main cover film is
secured in place. Verify that the ends of the end cap
are taped to protect the cover material. See the end
cap installation steps if needed for details.
Step 5
Step 8
Top Channel of U-Channel