6
Revision date: 05.13.10
Important Information
Ground
Level
Inside of
Shelter
Outside of
Shelter
BASEBOARD NOTE
A customer-supplied baseboard and retaining board
are required
to attach the drop-down side panels. The
baseboard is optional but recommended for a building
with a roll-up side. See the exploded view below.
The baseboard runs the length of the frame at ground
level. The retaining board secures the drop-down curtain
to the baseboard.
The baseboard and retaining board are
supplied by the customer.
Retaining boards are attached during the drop-down
curtain installation. The retaining board is not used when
the building is equipped with a roll-up curtain panel.
Ground Level
Drop-Down
Curtain Panel
Optional
End Panel
Retaining Board
Baseboard
View shown from outside the shelter.
Fasteners (5/16" x 5" carriage bolts and FA4652 wood
screws) are included. Depending on board width, use 2
carriage bolts per rafter connection for the baseboard
and ribbon board. Evenly space the wood screws at 24".
Countersink heads if needed.
ATTENTION:
A baseboard is not required for buildings with
a roll-up side panel, but installing a baseboard is strongly
recommended. Fasteners are included to attach the boards
to the frame.
Secure baseboard and ribbon
board joints between rafters
as shown for best results.
Rafter Leg
or Ground
Post
2" x 6" Ribbon Board
1" x 4" Board
(Drop-Down
Curtain only)
U-Channel
End View
5/16" Nuts
(FALB32B)
5/16" x 5"
Carriage
Bolts
FA4652 Wood
Grip Screw
RIBBON BOARD REQUIRED: DROP-DOWN SIDES
A customer-supplied two-piece ribbon board is required
for the installation of the drop-down curtain. Consult the
Film Cover with Drop-Down Sides procedure for details
regarding the installation of a two-piece ribbon board.
Fasteners are included.
Customer supplies the materials
for the ribbon board.
RIBBON BOARD REQUIRED: ROLL-UP SIDES
A customer-supplied one-piece ribbon board is required
for the installation of the roll-up curtain. Consult the Film
Cover with Roll-Up Sides procedure for details regarding
the installation of a one-piece ribbon board. Fasteners are
included.
Customer supplies the materials for the ribbon
board.
DIAGRAMS ARE NOT TO SCALE.
2" x 6" Board
Double Poly Latch
U-Channel
End View
5/16" Nuts
(FALB32B)
1/4" Nut
(FALB01B)
&
Washer
(FAMF01B)
5/16" x 5"
Carriage
Bolts
1/4" x 2"
Carriage Bolt
Rafter Leg
or Ground
Post