8
Revision date: 05.13.10
ClearSpan
™
Pro Solar Star
™
Greenhouses
Overview
Ground Level
Customer-Supplied
Baseboards
End Rafter
Interior Rafter
Ridge Purlin
Under Purlin
Cable
Strut
Ground
Post
On-center
Drawing may show a model of a different length. Refer to
Quick Start section located in the back of these instructions
for on-center measurements and post layout.
Optional end panel shown. Additional purchase required.
OVERVIEW
This section describes assembling your greenhouse
frame. See illustration below to identify main parts.
Set the ground posts or mounting feet (as equipped).
1.
Locate the required parts for each assembly
2.
procedure.
Assemble the rafters and frame.
3.
Anchor the frame. Consult instructions for details.
4.
Attach panels (if equipped), roll-up or drop-down
5.
sides, and cover. (Additional purchase required for
end panels.)